Gap-Ridge-Camp-Karratha-WA

Woodside Petroleum Camp – Gap Ridge, Karratha

PROJECT: Woodside Petroleum Camp – Gap Ridge, Karratha CLIENT: Ngarda Alliance – Ngarda / Leighton joint venture SIZE: 4500 M² VALUE:$510 000.00 DURATION: 2 Weeks For this particular project we were tasked with paving all areas around the recreational facilities in a 400 man camp, where traditionally in the past, the areas would have been constructed […]

Woodside Petroleum Camp – Gap Ridge, Karratha Read More »

2

Varanus Island Compression Project

PROJECT: Varanus Island Compression Project CLIENT: WHBO Civil  for Apache Energy SIZE: 3,000 M² VALUE:$345,000.00 DURATION: 2 Weeks ACP Hardstand Solutions demonstrated their expertise to freight and barge 500 tonnes of palletised pavers and necessary equipment to Varanus Island, located 133km from Karratha in Western Australia. Our team were flown from Perth to Barrow Island,

Varanus Island Compression Project Read More »

Inscape # 3..

Mandurah Marina

PROJECT: Mandurah Marina CLIENT: Landcorp ENGINEERING: Cossill & Webley; TABEC LANDSCAPE DESIGN: Plan E SIZE: 9650m² VALUE: $470,000.00 DURATION: Stage by Stage ??? It wasn’t that long ago that Mandurah was a sleepy little fishing village, popular with retirees and holidaying families. The region has great waterways and is a haven for water-based activities but

Mandurah Marina Read More »

Cocos-460-blog

Rumah Baru Passenger & Freight Terminal – Cocos (Keeling) Island

PROJECT: RUMAH BARU PASSENGER & FREIGHT TERMINAL – COCOS (KEELING) ISLAND CLIENT: VDM Group SIZE: 3500M² VALUE: $490,000.00 DURATION: 2 weeks ACP Hardstand solutions were appointed to undertake the supply and installation of interlocking brick paving for the new passenger & freight terminal at Rumah Baru. The main challenges for this project were from a

Rumah Baru Passenger & Freight Terminal – Cocos (Keeling) Island Read More »

Port-Botany-90-degree1

Patricks Wharf Container Terminal – Port Botany NSW

PROJECT: Patricks Wharf Container Terminal expansion, Port Botany NSW CLIENT:    Fulton Hogan Pty Ltd SIZE: 49,000m² VALUE: $4,450,000.00 DURATION: Stage 1. 23,000m² duration 14 days – Stage 2. 26,000m² 5 weeks : Machine laid paving and apply Lock N Seal joint stabiliser. APC Hardstand Solutions completed this project September 2014 on time and within budget.   This

Patricks Wharf Container Terminal – Port Botany NSW Read More »

Toll-Fremantle-27000m21-300x225

Toll Holdings Intermodal, Rous Head Fremantle

Project: Toll Holdings Intermodal, Rous Head Fremantle CLIENT: Ahrens Pty Ltd SIZE: 27,000M² VALUE: $1,200,000.00 DURATION: 4 weeks Australia’s largest mover of freight, Toll Group, recently constructed a $20 million intermodal freight facility at the Port of Fremantle to offer importers and exporters access to its unmatched national freight network. Since utilising heavy duty machine

Toll Holdings Intermodal, Rous Head Fremantle Read More »

image1-300x225

Hunter Valley Bus Depot, Edgeworth, NSW

PROJECT: Hunter Valley Bus Depot, Edgeworth, NSW CLIENT:    KCE Civil Pty Ltd SIZE: 2,700m² VALUE: $186,000.00 DURATION: 7 days Description For this project, the engineer’s design solution was to use heavy duty 80mm thick interlocking pavers, providing the client with a flexible solution to asphalt and the added strength of concrete. With approximately 80-100 bus

Hunter Valley Bus Depot, Edgeworth, NSW Read More »

P1010785

ATCO Structures & Logistics Facility Hope Valley WA

APC Hardstand Solutions has completed work on the ATCO Structures and Logistics facility Western Australia.  For this exciting project we are contracted to install 21,000m² to hardstand areas. This is the first facility that ATCO Structures have purchased and subsequently constructed through the design process.  ACP Hardstand Solutions offered a paved alternative to reinforced concrete, which

ATCO Structures & Logistics Facility Hope Valley WA Read More »