PROJECT: Hunter Valley Bus Depot, Edgeworth, NSW
CLIENT: KCE Civil Pty Ltd
SIZE: 2,700m²
VALUE: $186,000.00
DURATION: 7 days
Description
For this project, the engineer’s design solution was to use heavy duty 80mm thick interlocking pavers, providing the client with a flexible solution to asphalt and the added strength of concrete.
With approximately 80-100 bus movements per day, this paving solution assures the client that should any maintenance be required in the future, minimal to no down time is experienced at the site for the next 20+ years.