PROJECT: WESTRAC Facility, Tomago NSW

CLIENT: Abi Group

SIZE: 82 000M2 (3.3 Million Pavers or 20 Acres)

VALUE: $3,300,000.00

DURATION: 4 Months

The paved hardstand solution for this project was Westrac’ s preferred choice.  They tried other solutions in the past but found paving provided the maintenance flexibility over other products. This project was designed for heavy vehicle traffic – up to a D11 Dozer which weighs approximately 105 tonnes with steel tracks.

Prior to being awarded the works, ACP Hardstand Solutions were required to meet with our client in New South Wales to discuss the project at length and present our capabilities to ensure we were the correct contractor for the project.