Oil & Gas case studies RSS
acpmin_gr1

Woodside Petroleum Camp – Gap Ridge, Karratha

    PROJECT: Woodside Petroleum Camp – Gap Ridge, Karratha CLIENT: Ngarda Alliance – Ngarda / Leighton joint venture SIZE: 4500 M² VALUE:$510 000.00 DURATION: 2 Weeks For this particular project we were tasked with paving all areas around the recreational facilities in a 400 man camp, where traditionally in the past, the areas would have […]