Hunter Valley Bus Depot, Edgeworth, NSW

image1

image3

 

 

 

 

 

 

 

PROJECT: Hunter Valley Bus Depot, Edgeworth, NSW

CLIENT:    KCE Civil Pty Ltd

 

SIZE: 2,700m²

VALUE: $186,000.00

DURATION: 7 days

Description

 

For this project, the engineer’s design solution was to use heavy duty 80mm thick interlocking pavers, providing the client with a flexible solution to asphalt and the added strength of concrete.

 

With approximately 80-100 bus movements per day, this paving solution assures the client that should any maintenance be required in the future, minimal to no down time is experienced at the site for the next 20+ years.

 